standard-title Projects

Projects

Loading…
  • Thermal Power Plant at Guddu

    Supply and Installation of 2 numbers fuel additive dosing skid along with fuel oil additive PentoMag 2000 for 2×210 MW Thermal Power Plant at Guddu.

  • f1 to Foundation Power Plant, Dharki.

    Supply of gas turbine compressor cleaning chemical fyre wash f1 to Foundation Power Plant, Dharki.

  • chemical fyre wash f3 to Fauji Kabeer Wala.

    Supply of gas turbine compressor cleaning chemical fyre wash f3 to Fauji Kabeer Wala.

  • Dera Muraad Jamali, Baluchistan.

    Supply of gas turbine compressor cleaning chemical fyre wash f1 to Uch power plant 1 and 2 Dera Muraad Jamali, Baluchistan.

  • Habibullah Costal Power Plant, Quetta.

    Supply of gas turbine compressor cleaning chemical fyre wash f1, f2 to Habibullah Costal Power Plant, Quetta.

  • Hub Power Plant, Hub Baluchistan.

    Supply of 4 numbers automatic controlled dosing skids and 400,000 kg fuel additive PentoMag 5500 kw for the treatment of 4 x 323 MW Thermal Power Units at Hub Power Plant, Hub Baluchistan.

  • Hub Power Plant.

    Supply and Installation of fuel oil additive and dosing skid for the performance of fuel oil treatment trial for 180 days at unit 323 MW units 1, 2 and 4 at Hub Power Plant.

  • Thermal Power Plant Jamshoro.

    Supply and Installation of 4 numbers fuel oil additive dosing skids and fuel oil additive PentoMag 2000 on turn key basis at 1 number 250 MW and 3 x 210 MW at Thermal Power Plant Jamshoro.

  • Thermal Power Plant at Bin Qassim.

    Supply and Installation of Emulsification Technology and dosing skids for the performance of fuel oil treatment trial for 30 days with PentoMuls Technology at 210 MW KESC Thermal Power Plant at Bin Qassim.

  • Thermal Power Plant AES Lal Pir.

    Supply of fuel oil additive PentoMag 2000 and 2 numbers dosing pumps for injection of fuel additive into the fuel supply lines 2 x 365 MW Thermal Power Plant AES Lal Pir.

  • Saba Power Plant.

    Supply and Installation of Emulsification Technology for the performance of fuel oil treatment trial for 30 days with PentoMuls Technology at 135 MW at Saba Power Plant.